0096522958111

Logo

Find A programme

X-mas Tree Inspection, Maintenance and Pressure Testing

Dates Venues Register
07/12/2025 - 11/12/2025 DUBAI

Introduction

X-mas Tree Inspection, Maintenance and Pressure Testing

 

Objectives

 

  • Develop the knowledge relationship between surface (Well Heads) and downhole
  • Investigate leaks and identify cause of leak
  • Determine Tubing pressures (based on depth of perfs, density of fluid and BHFP)
  • Investigate SAP pressures based on well pressure monitoring using 2 and 3 pen recorders
  • Explain influence of corrosion models on MAASP pressures and on Well Life Cycle

 

WHO SHOULD ATTEND?

This GLOBAL FRANCHISE training course is suitable to a wide range of professionals but will greatly benefit: 

  • Field Services Foremen
  • Operations Foremen
  • Petroleum Engineers
  • Production Engineers
  • Drilling Engineers
  • Completion Engineers
  • Oil Field Technical Staff
 
 Course Outline


Introduction – Well Heads and Xmas Trees

  • Operational Safety
  • Reservoirs, Wells and Well Heads
  • Problems Caused by Poor Cement Jobs
  • Well Construction and Primary Cement Jobs
  • Construction of a Well from Casings to Well Head
  • Productivity Index Calculated at Well Head
  • Well Head Main Functions
  • Practical Calculations to Determine Tubing Pressures based on Several Factors
  • Well Head Classifications
  • API Specification 6A
  • Basic Components of a Well Head
  • Well Head Installation Movie
  • Casing Head / Casing Head Function
  • Investigation and Discussion of SAP Case 1

Continuation of Well Head Components

  • Casing Spool / Casing Spool Function
  • Casing Hangers
  • Tubing Heads and Tubing Hangers
  • Investigation and Discussion of SAP Case 2
  • Continuation of Tubing Hangers
  • Tubing Head Adapters
  • Typical Xmas Tree Components
  • Fix Chokes and Adjustable Chokes
  • Flanges (6B and 6BX types)
  • Seals and Gaskets
  • Unitized Well Head
  • The BOP

Xmas Tree Installation, Pressure Testing

  • Xmas Tree Installation
  • Well Head Repairs
  • Hydraulic and Pneumatic Actuators
  • Investigation and Discussion of SAP Case 3
  • Casing Hangers and Well Pressure Control
  • Common Pack Offs and Secondary Seals
  • Tubing Hangers (cross sections)
  • Tests and Leak Path Determination
  • Unitized Well Heads
  • Basic Rules for Pressure Testing Well Heads
  • Test Schematics of Well Heads
  • Movie: Testing Well Head
  • Example of Sealing Cavity with Sealant
  • Basic Requirements of a Well Completion
  • Casing String Types
  • Liners, Liner Hangers and Tie Back Liners
  • Effects of Pressure in “b” and “c” Annulus

Well Head Repairs and Well Integrity

  • Well Head Repairs and Casing Repairs
  • Surface Casing Corrosion
  • Burst and Collapse Pressure Decline with Time
  • MAASP Calculations for Annulus A
  • Short Introduction on Material Selection
  • Corrosion Monitoring Tools
  • Cathodic Protection
  • Well Integrity: Safety and Operational Aspects
  • Constructing a Well with Integrity
  • Well Integrity Issues
  • The Important of SC-SSSV
  • Well Head Components and Well Integrity Assurance Guidelines
  • Risk Management
  • WIMS: Well Integrity Management System
  • Industry Standards and Guidelines
  • Well Integrity Drivers and Implementation
  • Well Integrity Envelope
  • Well Integrity, Annular Pressures and Well Head Monitoring
  • SAP (Sustainable Annulus Pressures) Wells
  • Investigation and Discussion of SAP Case  4

Make an enquiry about seminar

Live chat by BoldChat